Ebc Double-H Sintered Brake Pads - Front: Bmw : 1988-1993 K1 (16 Valve…
Description
The EBC Double-H Sintered brake pads are the standard in sintered pads. These brake pads are long lasting and offer quick reaction time & biting stopping performance and both dry and wet conditions. ECE R 90 brake safety approved. Note: Check your local MCS dealer or the MCS sales department for exact type of approval and validity on bike model and years on the test report.
Fitment
- Front: BMW : 88-93 K1 (16 Valve - ABS Models - Remove ABS ring from old rotor and refit to new EBC rotor. Note: Ensure all mounting surfaces are clean and when refitting bolts use a thread lock cement to hold them in place.)
- 88-93 K1 (16 Valve - Non ABS Models)
- 89-92 K100 RS (16 Valve - ABS Models - Remove ABS ring from old rotor and refit to new EBC rotor. Note: Ensure all mounting surfaces are clean and when refitting bolts use a thread lock cement to hold them in place.)
- 89-92 K100 RS (16 Valve - Non ABS Models)
- 89-93 K1100 LT 1989-1999 (ABS Models - Remove ABS ring from old rotor and refit to new EBC rotor. Note: Ensure all mounting surfaces are clean and when refitting bolts use a thread lock cement to hold them in place.)
- 89-93 K1100 LT 1989-1999 (Non ABS Models)
- 92-96 K1100 RS (ABS Models - Remove ABS ring from old rotor and refit to new EBC rotor. Note: Ensure all mounting surfaces are clean and when refitting bolts use a thread lock cement to hold them in place.)
- 92-96 K1100 RS (Non ABS Models)
- 98-00 K1200 LT 1997-Oct. 2000 (Integral ABS & STD ABS Models - Remove ABS ring from old rotor and refit to new EBC rotor. Note: Ensure all mounting surfaces are clean and when refitting bolts use a thread lock cement to hold them in place.)
- 97 K1200 LT 1997-Oct. 2000 (Integral ABS & STD ABS Models - Remove ABS ring from old rotor and refit to new EBC rotor. Note: Ensure all mounting surfaces are clean and when refitting bolts use a thread lock cement to hold them in place.)
- 96-00 K1200 RS (ABS & Non ABS Models - Remove rotor outer ring from centre casting and refit. )
- 93-96 R100 Mystic
- 91-95 R100 R
- 93-99 R1100 GS (STD & ABS - Remove ABS ring from old rotor and refit to new EBC rotor. Note: Ensure all mounting surfaces are clean and when refitting bolts use a thread lock cement to hold them in place.)
- 94-96 R1100 R 1993-May 1996 (Spoke wheel)
- 93-01 R1100 R (Cast Wheel - Remove rotor outer ring from centre casting and refit. )
- 92-01 R1100 RS (Remove ABS ring from old rotor and refit to new EBC rotor. Note: Ensure all mounting surfaces are clean and when refitting bolts use a thread lock cement to hold them in place.)
- 94-01 R1100 RT (Cast Wheel - ABS - Remove ABS ring from old rotor and refit to new EBC rotor. Note: Ensure all mounting surfaces are clean and when refitting bolts use a thread lock cement to hold them in place.)
- 94-01 R1100 RT (Spoke wheel)
- 96-00 R1100 S 1996-Nov. 2000 (ABS - Remove ABS ring from old rotor and refit to new EBC rotor. Note: Ensure all mounting surfaces are clean and when refitting bolts use a thread lock cement to hold them in place.)
- 98 R1150 GS R21/0415/0495 (1998-Oct. 2001 - Remove ABS ring from old rotor and refit to new EBC rotor. Note: Ensure all mounting surfaces are clean and when refitting bolts use a thread lock cement to hold them in place.)
- 99-01 R1150 GS R21/0415/0495 - 1998-Oct. 2001 (Remove ABS ring from old rotor and refit to new EBC rotor. Note: Ensure all mounting surfaces are clean and when refitting bolts use a thread lock cement to hold them in place.)
- 00-02 R1200 Independent (Cast wheel)
- 00-02 R1200 Independent (Spoke wheel)
- 96-02 R1200 C (Cast Wheel - ABS - Remove ABS ring from old rotor and refit to new EBC rotor. Note: Ensure all mounting surfaces are clean and when refitting bolts use a thread lock cement to hold them in place.)
- 96-02 R1200 C (Spoke Wheel - ABS - Remove ABS ring from old rotor and refit to new EBC rotor. Note: Ensure all mounting surfaces are clean and when refitting bolts use a thread lock cement to hold them in place.)
- 94-95 R80 Mystic
- 91-94 R80 R
- 97-00 R850 C (Cast Wheel - ABS - Remove ABS ring from old rotor and refit to new EBC rotor. Note: Ensure all mounting surfaces are clean and when refitting bolts use a thread lock cement to hold them in place.)
- 97-00 R850 C (Spoke Wheel - ABS - Remove ABS ring from old rotor and refit to new EBC rotor. Note: Ensure all mounting surfaces are clean and when refitting bolts use a thread lock cement to hold them in place.)
- 96-00 R850 GS (STD & ABS - Remove ABS ring from old rotor and refit to new EBC rotor. Note: Ensure all mounting surfaces are clean and when refitting bolts use a thread lock cement to hold them in place. Remove outer ring fom centre casting and refit.)
- 94 R850 R (1994-May 1996 - Spoke wheel)
- 94-02 R850 R (Cast Wheel - ABS - Remove ABS ring from old rotor and refit to new EBC rotor. Note: Ensure all mounting surfaces are clean and when refitting bolts use a thread lock cement to hold them in place.)
- 95-96 R850 R - 1994-May 1996 (Spoke wheel)
- 96-01 R850 RT (Cast Wheel - ABS - Remove ABS ring from old rotor and refit to new EBC rotor. Note: Ensure all mounting surfaces are clean and when refitting bolts use a thread lock cement to hold them in place.)
- 96-01 R850 RT (Spoke wheel)
Product Details
- Brand: EBC
- Category: Brake > Brake pads
- Unit: pr
- Product code: 8110744
Part Numbers
MCS Part Number: 8110744
Manufacturer Part Number: FA407HH
Will this fit my motorcycle?
This motorcycle is saved on this device.
My Garage
Enter your UK postcode for a quick estimate before adding to your basket. Enter your postcode to check delivery.
This estimate is for the selected item and quantity on their own. Shipping for your complete order is recalculated in the basket and shown again at checkout before payment. Your full order is recalculated in the basket and confirmed at checkout.
Need help with this part?
Enter your UK postcode for a quick estimate before adding to your basket. Enter your postcode to check delivery.
This estimate is for the selected item and quantity on their own. Shipping for your complete order is recalculated in the basket and shown again at checkout before payment. Your full order is recalculated in the basket and confirmed at checkout.
30-day returns on eligible items
Our additional returns offer covers unused items when you contact us within 30 days after delivery. Your statutory rights, including for sale items, are unaffected. Read our returns policy.
Shipping information
Our stock is held at several warehouses located in the UK, Germany and The Netherlands. Our inventory management system aggregates the stock levels in all locations.
Where an item is marked as "ready to be shipped" or "in stock" it means that it is available from one of the warehouses, not necessarily in the UK. Where an item is stocked outside of the UK we will have the item(s) brought over to our UK base and will then ship it to you.
All items are shipped from the UK meaning that the price you see is the price you pay. All import duties and taxes have already been paid by us.
It normally takes 2-3 working days for goods to come in from Europe.
If you are planning on coming to our store for a specific item, please contact us first to ensure it is in UK stock to avoid a wasted journey.
Occasionally, events beyond our control may cause delays.
Returns & warranty
Contact us within 30 days after delivery to return an unused item under our additional returns offer. Conditions apply.
Free tracked UK return labels are available for qualifying parcels under 20 kg and within 61 × 46 × 46 cm.
Your statutory cancellation and faulty-goods rights are unaffected, including for sale items. Any manufacturer’s warranty is additional to those rights.
For the full conditions, refund details and how to return an item, see our returns policy. Contact sales@hogparts.co.uk for help.